Electrical Engineer
Electrical engineer with 4+ consecutive years of experience in heavy industries major in mining plants as electrical engineer, primary focusing on installation, maintenance, and repair of electrical systems and 6 months periodic experience in power plant operation and maintenance. Possessing interpersonal skills and wide range of technical skills. I enjoy being a part of team as well as managing, motivating, and training a productive team and thrive in high-pressure and challenging work environment.
Last Resume Update | May 4, 2022 |
Address | mtwara, Tanzania, United Republic of |
malicksungu19@gmail.com | |
Phone Number | +255625374857 |
Experience
Dangote Cement Limited
Electrical engineer
Electrical engineer
Jun 2020
- Current
Responsibilities.
• Performing electrical installation, testing, and commissioning of electrical systems
• Undertaking electrical maintenance of both LV and MV equipment’s
• Section head of grinding line from crusher to material holding circuit
• Performing transformer oil filtration
• Servicing, troubleshooting of various electrical faults of electrical systems and machines under cement plants
• Attending electrical switching at substation up to 11kV
• Attending electrical preventive maintenance of MV and LV switchgears ABB make up to 11kV
• Performing electrical preventive maintenance of electric motor up to 5.5MW 11kV
• Performing Medium voltage cable termination up to 11kV
• Undertaking general supervision of electrical tasks
• Performing medium voltage high potential (hi-pot) test up to 11kV
• Attending shift tasks as shift engineer in charge
• Performing electrical installation, testing, and commissioning of electrical systems
• Undertaking electrical maintenance of both LV and MV equipment’s
• Section head of grinding line from crusher to material holding circuit
• Performing transformer oil filtration
• Servicing, troubleshooting of various electrical faults of electrical systems and machines under cement plants
• Attending electrical switching at substation up to 11kV
• Attending electrical preventive maintenance of MV and LV switchgears ABB make up to 11kV
• Performing electrical preventive maintenance of electric motor up to 5.5MW 11kV
• Performing Medium voltage cable termination up to 11kV
• Undertaking general supervision of electrical tasks
• Performing medium voltage high potential (hi-pot) test up to 11kV
• Attending shift tasks as shift engineer in charge
Geita Gold Mining Limited
Electrical engineer
Electrical engineer
Oct 2018
- May 2020
Responsibilities; -
• Undertaking contractor Supervision to execute electrical projects
• Performing preventive maintenance of electrical motor of both LV and MV up to 11KV,4.5MW
• Attending electrical break down under crushing plant and water treatment and pumping stations
• Performing electrical preventive maintenance of Transformers up to 2.5MVA
• Transformer testing, fault finding and rectification
• Servicing and troubleshooting of electrical faults in electrical systems and machines
• Performing electrical installation of process plant equipment’s
• Undertaking electrical services in electrical compressors make compressor champion
• Undertaking electrical inspection of electrical machines under process plant
• Performing electrical services for electrical pumps at different water pumping stations
• Upgrading compressors make compressor champion to electronic card control
• Performing electrical Installation of different electrical starters i.e., liquid resistance starter, Direct online starter, Star delta starter, VSD, Soft starter and VFD
• Performing electrical installation, testing, and commissioning of electrical projects under Geita gold mining limited not limited to CAF plant, and shotcrete plant construction.
• Upgrading cabling systems and arrangement, connection, testing, and commissioning
• Performing electrical installation of electrical water pumps
• Improving of earthing system
• Undertaking contractor Supervision to execute electrical projects
• Performing preventive maintenance of electrical motor of both LV and MV up to 11KV,4.5MW
• Attending electrical break down under crushing plant and water treatment and pumping stations
• Performing electrical preventive maintenance of Transformers up to 2.5MVA
• Transformer testing, fault finding and rectification
• Servicing and troubleshooting of electrical faults in electrical systems and machines
• Performing electrical installation of process plant equipment’s
• Undertaking electrical services in electrical compressors make compressor champion
• Undertaking electrical inspection of electrical machines under process plant
• Performing electrical services for electrical pumps at different water pumping stations
• Upgrading compressors make compressor champion to electronic card control
• Performing electrical Installation of different electrical starters i.e., liquid resistance starter, Direct online starter, Star delta starter, VSD, Soft starter and VFD
• Performing electrical installation, testing, and commissioning of electrical projects under Geita gold mining limited not limited to CAF plant, and shotcrete plant construction.
• Upgrading cabling systems and arrangement, connection, testing, and commissioning
• Performing electrical installation of electrical water pumps
• Improving of earthing system
State Grid Electrical and Technical works Limited
Electrical Site Engineer
Electrical Site Engineer
Jul 2017
- Sep 2018
Responsibilities; -
• Design and construction of low voltage distribution networks
• Undertaking Transformer testing at manufacturing line up to 33kV/0.4kV 500KVA transformers
• Performing electrical project supervision, Auditing, testing, and commissioning under REA projects
• Medium voltage line construction, testing and commissioning up to 33kV
• Undertaking Maintenance of cable manufacturing machines including 64 bobbin ACSR cable rolling machine and copper harnessing machines
• Performing electrical design of power line and building construction
• Supervising sub-contractors in project execution
• Undertaking project supervision of proposed test house at TBS site
• Designing and installation of power factor correction system
• Design and construction of low voltage distribution networks
• Undertaking Transformer testing at manufacturing line up to 33kV/0.4kV 500KVA transformers
• Performing electrical project supervision, Auditing, testing, and commissioning under REA projects
• Medium voltage line construction, testing and commissioning up to 33kV
• Undertaking Maintenance of cable manufacturing machines including 64 bobbin ACSR cable rolling machine and copper harnessing machines
• Performing electrical design of power line and building construction
• Supervising sub-contractors in project execution
• Undertaking project supervision of proposed test house at TBS site
• Designing and installation of power factor correction system
Education
Dar Es Salaam Institute of Technology
Bachelor of engineering in electrical engineering
Bachelor of engineering in electrical engineering
Oct 2013
- Jul 2017
Completed with upper second class GPA of 3.8
Ifunda Technical Secondary School
Advanced level certificate
Advanced level certificate
Apr 2011
- Feb 2013
Completed with division three point 12
Kiwele Secondary School
Ordinary Level CSE
Ordinary Level CSE
Jan 2007
- Oct 2010
completed with division one point 15