RAN Integration Engineer
Location | Dar es Salaam, Tanzania, United Republic of |
Date Posted | May 10, 2022 |
Category | Engineering IT / Information Technology |
Job Type | Full-time |
Currency | TZS |
Description
About the job
2G
Provisional of the current network dump file
Frequency Planning
LAC Planning wrt to neighboring sites
Neighbors planning
2G <>2G
2G<> 3G
2G<>4G
Dimensioning of SDCCH & TCH timeslots
Provisional of the standard parameter template for preparation of site commissioning file
Preparation of sites Commissioning file wrt to existing sites
parameters (using standard parameter template)
Preparation of the service port on TX node
E2E routing of the service
Physical termination of the site at TX node
Data fill preparation for site creation at BSC and Core
Site Creation at the BSC and Core ( both CS and PS Core)
Creating the site by loading site commissioning file at the BTS
Site conversion from SRAT to SRAN whenever applicable
3G
Provisional of the current network dump file
Scrambling Codes Planning
LAC planning wrt to neighboring sites
Neighbors planning
3G <>3G
2G<> 3G
3G<>4G
Power setting configuration as per agreed power setting with
Maktech team
Provisional of the standard parameter template for preparation of site commissioning file
Preparation of sites Commissioning file wrt to existing sites
parameters (using standard parameter template)
Preparation of the service port on TX node
E2E routing of the service
Physical termination of the site at TX node
Data fill preparation for site creation at RNC and Core
Site Creation at the RNC and Core ( both CS and PS Core)
Creating the site by loading site commissioning file at the BTS
Site conversion from SRAT to SRAN whenever applicable
4G
Provisional of the current network dump file
PCI Planning
TAC planning wrt to neighboring sites
Neighbors planning ( ANR tool is functioning properly for 4G technology)
Power setting configuration as per agreed power setting with
Maktech team
Provisional of the standard parameter template for preparation of site commissioning file
Preparation of sites Commissioning file wrt to existing sites
parameters (using standard parameter template)
Preparation of the service port on TX node
E2E routing of the service
Physical termination of the site at TX node
Data fill preparation for site creation at the Core
Site Creation at Core
Creating the site by loading site commissioning file
Site conversion from SRAT to SRAN whenever applicable