2G

Provisional of the current network dump file

Frequency Planning

LAC Planning wrt to neighboring sites

Neighbors planning

2G <>2G

2G<> 3G

2G<>4G

 

Dimensioning of SDCCH & TCH timeslots

Provisional of the standard parameter template for preparation of site commissioning file

Preparation of sites Commissioning file wrt to existing sites

parameters (using standard parameter template)

 

Preparation of the service port on TX node

E2E routing of the service

Physical termination of the site at TX node

Data fill preparation for site creation at BSC and Core

Site Creation at the BSC and Core ( both CS and PS Core)

Creating the site by loading site commissioning file at the BTS

Site conversion from SRAT to SRAN whenever applicable

 

3G

Provisional of the current network dump file

Scrambling Codes Planning

LAC planning wrt to neighboring sites

Neighbors planning

3G <>3G

2G<> 3G

3G<>4G

Power setting configuration as per agreed power setting with

Maktech team

Provisional of the standard parameter template for preparation of site commissioning file

Preparation of sites Commissioning file wrt to existing sites

parameters (using standard parameter template)

Preparation of the service port on TX node

E2E routing of the service

Physical termination of the site at TX node

Data fill preparation for site creation at RNC and Core

Site Creation at the RNC and Core ( both CS and PS Core)

Creating the site by loading site commissioning file at the BTS

Site conversion from SRAT to SRAN whenever applicable

4G

Provisional of the current network dump file

PCI Planning

TAC planning wrt to neighboring sites

Neighbors planning ( ANR tool is functioning properly for 4G technology)

Power setting configuration as per agreed power setting with

Maktech team

Provisional of the standard parameter template for preparation of site commissioning file

Preparation of sites Commissioning file wrt to existing sites

parameters (using standard parameter template)

Preparation of the service port on TX node

E2E routing of the service

Physical termination of the site at TX node

Data fill preparation for site creation at the Core

Site Creation at Core

Creating the site by loading site commissioning file

Site conversion from SRAT to SRAN whenever applicable